The Syrian Parliament is a historical building. All elements were made out of stones, structurally and architecturally. Eacon was contracted to design and build a basement department. the project was a technical challenge where we had to maintain the structural soundness and upgrade the interior design. Eacon executed the project in a precise alternative sequence, excavating under the stone wall and supporting it, then casting concrete foundations. After providing foundations the basement was excavated and built.
Supporting Syrian Parliament walls in preparation for installing foundations
The walls are supported to add a basement level undur the Syrian Parliament building