Marriot is a five star hotel. It was built in 1973 and its structural elements started to age. Eacon was contracted to execute strengthening works of shear walls and columns of the two towers, one consists of 16 floors and the other consists of 12 stories.
Pumping concrete for higher level concrete jacketing.
supporting old footing and chipping concrete in preparation of strengthening it.
Installing reinforcing steel for neck columns.
Shuttering ready to receive concrete to strengthen this level.
Installing steel reinforcement to strengthen sheer walls.
Installing steel bars in drilled holes with epoxy bonding agent to increase the size of the foundations.
Shattering for walls Jacketing
Installing steel reinforcement for walls concrete jacketing.
Complicated pipes arrangements to deliver concrete into work site.
Pumping concrete into work site.
Finishing the surface of the newly strengthened foundation.
Casting concrete in expanded foundation shattering.
Casting concrete in expanded foundation shattering.
Excavation in preparation for neck columns concrete jacketing.