The Syrian Parliament is a historical building. All elements were made out of stones, structurally and architecturally. Eacon was contracted to design and build a basement department. the project was a technical challenge where we had to maintain the structural soundness and upgrade the interior design. Eacon executed the project in a precise alternative sequence, excavating under the stone wall and supporting it, then casting concrete foundations. After providing foundations the basement was excavated and built.